Triple

T22351410
Position Surface form Disambiguated ID Type / Status
Subject Songyu Port Area E552538 entity
Predicate instanceOf P0 FINISHED
Object harbor terminal zone C453 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: harbor terminal zone
Context triple: [Songyu Port Area, instanceOf, harbor terminal zone]
  • A. harbor chosen
    A harbor is a sheltered body of water, often equipped with docks and facilities, where ships can anchor safely for loading, unloading, and protection from rough seas.
  • B. harbor system
    A harbor system is an integrated arrangement of physical infrastructure, navigational facilities, operational processes, and regulatory mechanisms that collectively enable the safe, efficient berthing, handling, and movement of vessels, cargo, and passengers within a coastal or inland port area.
  • C. harbor company
    A harbor company is an organization that manages, operates, and maintains port facilities and related maritime services for the handling of ships, cargo, and passengers.
  • D. harbormaster office
    A harbormaster office is the administrative and operational center at a port or marina responsible for coordinating vessel movements, enforcing harbor regulations, and managing maritime safety and services.
  • E. harbour crossing
    A harbour crossing is a transportation route or structure, such as a bridge, tunnel, or ferry service, that enables people and vehicles to travel across a harbour.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e4a0ad08190a385b4d343cf6524 completed April 16, 2026, 5:37 p.m.
Created at: April 16, 2026, 8:44 p.m.