Triple

T22348823
Position Surface form Disambiguated ID Type / Status
Subject El Chocón Dam E552471 entity
Predicate gridConnection P845 FINISHED
Object Argentine Interconnection System NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Argentine Interconnection System | Statement: [El Chocón Dam, gridConnection, Argentine Interconnection System]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Argentine Interconnection System
Context triple: [El Chocón Dam, gridConnection, Argentine Interconnection System]
  • A. Argentine National Interconnected System chosen
    The Argentine National Interconnected System is the nationwide high-voltage electricity transmission network that links most of Argentina’s power plants with its regional distribution grids.
  • B. South American power grid
    The South American power grid is the interconnected network of electricity generation, transmission, and distribution systems across South American countries, integrating major resources such as large hydroelectric complexes to supply power regionally.
  • C. Brazilian National Interconnected System
    The Brazilian National Interconnected System is the nationwide electricity grid that links most of Brazil’s power plants and regions into a single, integrated power network.
  • D. Colombian National Interconnected System
    The Colombian National Interconnected System is the nationwide electricity grid that integrates Colombia’s power generation, transmission, and distribution infrastructure into a unified network.
  • E. Chilean national power system
    The Chilean national power system is the interconnected electricity grid that generates, transmits, and distributes most of Chile’s electrical energy across the country.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e4a0ad08190a385b4d343cf6524 completed April 16, 2026, 5:37 p.m.
NER Named-entity recognition batch_69f1579a1c308190ae2174f99ae317ab completed April 29, 2026, 12:58 a.m.
Created at: April 16, 2026, 8:43 p.m.