Triple
T22344156
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | lint |
E552347
|
entity |
| Predicate | executionPhase |
P22825
|
FINISHED |
| Object | before compilation |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: before compilation | Statement: [lint, executionPhase, before compilation]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: executionPhase Context triple: [lint, executionPhase, before compilation]
-
A.
programPhase
chosen
Indicates the specific stage or phase within a broader program or process that an entity is currently associated with.
-
B.
applicationPhase
Indicates the specific stage or step an application is currently in within a broader application process.
-
C.
targetsPhase
Indicates that an action, process, or entity is specifically directed toward or intended to affect a particular phase or stage within a larger sequence or lifecycle.
-
D.
finalPhaseOf
Indicates that one process, stage, or event constitutes the concluding or last phase of another broader process or sequence.
-
E.
scriptPhase
Indicates that one process, event, or component occurs during a particular stage or phase of a larger scripted or planned sequence.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e11e494eec81909c4d2d51f69499d9 |
completed | April 16, 2026, 5:37 p.m. |
| NER | Named-entity recognition | batch_69f15796b2288190b10e9402abf35fd3 |
completed | April 29, 2026, 12:57 a.m. |
| PD | Predicate disambiguation | batch_69e7300c20088190a59e5bf9e70384f3 |
completed | April 21, 2026, 8:06 a.m. |
Created at: April 16, 2026, 8:43 p.m.