Triple

T22342615
Position Surface form Disambiguated ID Type / Status
Subject Fairlie-Poplar Historic District E552311 entity
Predicate street P959 FINISHED
Object Marietta Street NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Marietta Street | Statement: [Fairlie-Poplar Historic District, street, Marietta Street]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Marietta Street
Context triple: [Fairlie-Poplar Historic District, street, Marietta Street]
  • A. Marietta Street chosen
    Marietta Street is a prominent thoroughfare in downtown Atlanta known for its historic significance and proximity to major city attractions and commercial centers.
  • B. Monument Street
    Monument Street is a road in the City of London, best known for leading to the Monument to the Great Fire of London near London Bridge.
  • C. Morehead Street
    Morehead Street is a local roadway in the Lambton area, serving as part of the neighborhood’s residential street network.
  • D. Fayette Street
    Fayette Street is a notable thoroughfare whose name has been used for other streets, such as West Fayette Street, reflecting its local or historical significance.
  • E. Georgia Street
    Georgia Street is a major thoroughfare in downtown Vancouver, British Columbia, known for connecting the city’s urban core to Stanley Park and the nearby Lost Lagoon.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e494eec81909c4d2d51f69499d9 completed April 16, 2026, 5:37 p.m.
NER Named-entity recognition batch_69f15795b2a881908d6cb8f97443ca17 completed April 29, 2026, 12:57 a.m.
Created at: April 16, 2026, 8:43 p.m.