Triple
T22341643
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Inês de Castro (play) |
E552288
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Portuguese Renaissance drama |
C15181
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Portuguese Renaissance drama Context triple: [Inês de Castro (play), instanceOf, Portuguese Renaissance drama]
-
A.
Portuguese play
chosen
A Portuguese play is a theatrical work written in or originating from Portugal, reflecting its language, culture, and dramatic traditions.
-
B.
Renaissance play
A Renaissance play is a dramatic work written during the European Renaissance that blends classical influences with contemporary themes, often exploring humanism, politics, and complex character psychology through verse and staged performance.
-
C.
Portuguese literary work
A Portuguese literary work is a written artistic creation originally composed in the Portuguese language, encompassing genres such as poetry, prose, and drama, and reflecting the cultural, historical, and social contexts of Portuguese-speaking communities.
-
D.
English Renaissance drama
English Renaissance drama is a body of theatrical works produced in England roughly between the late 15th and early 17th centuries, characterized by poetic language, complex characters, and a blend of classical influences with contemporary social, political, and religious themes.
-
E.
Portuguese literature
Portuguese literature encompasses the body of written works produced in the Portuguese language, reflecting the cultural, historical, and social evolution of Portugal and Lusophone communities worldwide.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e11e494eec81909c4d2d51f69499d9 |
completed | April 16, 2026, 5:37 p.m. |
Created at: April 16, 2026, 8:43 p.m.