Triple

T22334673
Position Surface form Disambiguated ID Type / Status
Subject Fuorigrotta district E552111 entity
Predicate roadConnection P385 FINISHED
Object Tangenziale di Napoli NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Tangenziale di Napoli | Statement: [Fuorigrotta district, roadConnection, Tangenziale di Napoli]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Tangenziale di Napoli
Context triple: [Fuorigrotta district, roadConnection, Tangenziale di Napoli]
  • A. A3 Naples–Salerno motorway
    The A3 Naples–Salerno motorway is a major Italian highway in Campania that links the city of Naples with Salerno and serves as a key route toward southern Italy.
  • B. Rome–Fiumicino motorway
    The Rome–Fiumicino motorway is a major Italian highway that connects central Rome with Leonardo da Vinci–Fiumicino Airport, serving as the primary road link between the city and its main international air hub.
  • C. A19 Palermo–Catania motorway
    The A19 Palermo–Catania motorway is a major Italian highway in Sicily that links the island’s northwestern capital Palermo with the eastern city of Catania, crossing the island’s interior.
  • D. Strada Statale 148 Pontina
    Strada Statale 148 Pontina is a major Italian state highway in the Lazio region that connects Rome with coastal and southern towns such as Pontinia and Latina.
  • E. Strada Statale 115
    Strada Statale 115 is a major state highway in Sicily that runs along the island’s southern coast, connecting numerous towns and cities across the region.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Tangenziale di Napoli
Target entity description: The Tangenziale di Napoli is a major ring road and toll expressway that bypasses central Naples, easing traffic by linking various districts and regional highways around the city.
  • A. A3 Naples–Salerno motorway
    The A3 Naples–Salerno motorway is a major Italian highway in Campania that links the city of Naples with Salerno and serves as a key route toward southern Italy.
  • B. Rome–Fiumicino motorway
    The Rome–Fiumicino motorway is a major Italian highway that connects central Rome with Leonardo da Vinci–Fiumicino Airport, serving as the primary road link between the city and its main international air hub.
  • C. A19 Palermo–Catania motorway
    The A19 Palermo–Catania motorway is a major Italian highway in Sicily that links the island’s northwestern capital Palermo with the eastern city of Catania, crossing the island’s interior.
  • D. Strada Statale 148 Pontina
    Strada Statale 148 Pontina is a major Italian state highway in the Lazio region that connects Rome with coastal and southern towns such as Pontinia and Latina.
  • E. Strada Statale 115
    Strada Statale 115 is a major state highway in Sicily that runs along the island’s southern coast, connecting numerous towns and cities across the region.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e482f788190b78d1588fc26d606 completed April 16, 2026, 5:37 p.m.
NER Named-entity recognition batch_69f1577e35f48190b11789d80182653e completed April 29, 2026, 12:57 a.m.
Created at: April 16, 2026, 8:43 p.m.