Triple
T22327583
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Transit Division |
E551939
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | public transit agency division |
C1888
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: public transit agency division Context triple: [Transit Division, instanceOf, public transit agency division]
-
A.
public transit operations division
The public transit operations division is responsible for planning, scheduling, managing, and overseeing the daily operation and performance of a region’s public transportation services.
-
B.
public transportation agency
A public transportation agency is an organization responsible for planning, operating, and managing shared transit services such as buses, trains, and other modes to provide mobility for the public within a defined region.
-
C.
transit agency board
A transit agency board is a governing body that sets policy, oversees funding and strategic direction, and provides public accountability for a region’s public transportation system.
-
D.
mass transit operator
A mass transit operator is an entity responsible for managing, coordinating, and providing public transportation services such as buses, trains, or subways within a specific region or network.
-
E.
rapid transit division
chosen
A rapid transit division is an organizational unit within a transportation agency responsible for planning, operating, and maintaining high-frequency, high-capacity urban rail or bus rapid transit services.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e11e482f788190b78d1588fc26d606 |
completed | April 16, 2026, 5:37 p.m. |
Created at: April 16, 2026, 8:42 p.m.