Triple
T22321208
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Royal Navy communications station |
E551789
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | naval base type |
C18743
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: naval base type Context triple: [Royal Navy communications station, instanceOf, naval base type]
-
A.
naval training base
A naval training base is a dedicated military facility where naval personnel receive instruction, practice, and preparation in seamanship, warfare, and support operations.
-
B.
naval arsenal
A naval arsenal is a specialized military facility where warships are built, repaired, equipped, and supplied with weapons, ammunition, and other naval stores.
-
C.
former naval base
A former naval base is a decommissioned military maritime facility that once supported naval operations but has since been repurposed, abandoned, or converted to civilian use.
-
D.
naval shore establishment
chosen
A naval shore establishment is a land-based facility that supports a navy’s operations, administration, training, logistics, and maintenance away from seagoing vessels.
-
E.
naval air station
A naval air station is a military airfield operated by a navy, providing facilities for the operation, maintenance, training, and support of naval aircraft and their personnel.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e11e4776588190abb21e5cea79973f |
completed | April 16, 2026, 5:37 p.m. |
Created at: April 16, 2026, 8:42 p.m.