Triple

T22316295
Position Surface form Disambiguated ID Type / Status
Subject Torrejón-Tajo Dam E551652 entity
Predicate hasReservoir P1025 FINISHED
Object Torrejón-Tajo Reservoir NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Torrejón-Tajo Reservoir | Statement: [Torrejón-Tajo Dam, hasReservoir, Torrejón-Tajo Reservoir]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Torrejón-Tajo Reservoir
Context triple: [Torrejón-Tajo Dam, hasReservoir, Torrejón-Tajo Reservoir]
  • A. Ribarroja Reservoir
    Ribarroja Reservoir is a large artificial lake on the Ebro River in northeastern Spain, used primarily for hydroelectric power generation, irrigation, and water regulation.
  • B. Torrejón-Tajo Dam
    Torrejón-Tajo Dam is a major hydraulic structure on the Tagus River in Spain, used primarily for water regulation and hydroelectric power generation within the Tagus Basin.
  • C. Pilarcitos Reservoir
    Pilarcitos Reservoir is a key drinking water storage reservoir on the San Francisco Peninsula that helps supply water to the San Francisco Bay Area.
  • D. Montijo Reservoir
    Montijo Reservoir is an artificial lake and water storage facility located within Spain’s Guadiana River basin, used primarily for irrigation, water supply, and regional water management.
  • E. Alcántara Reservoir
    Alcántara Reservoir is a large artificial lake in western Spain, created by damming the Tagus River system and used primarily for hydroelectric power generation, irrigation, and water supply.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Torrejón-Tajo Reservoir
Target entity description: Torrejón-Tajo Reservoir is an artificial water body in Spain formed by the Torrejón-Tajo Dam on the Tagus River, used primarily for water regulation and hydroelectric purposes.
  • A. Ribarroja Reservoir
    Ribarroja Reservoir is a large artificial lake on the Ebro River in northeastern Spain, used primarily for hydroelectric power generation, irrigation, and water regulation.
  • B. Torrejón-Tajo Dam chosen
    Torrejón-Tajo Dam is a major hydraulic structure on the Tagus River in Spain, used primarily for water regulation and hydroelectric power generation within the Tagus Basin.
  • C. Pilarcitos Reservoir
    Pilarcitos Reservoir is a key drinking water storage reservoir on the San Francisco Peninsula that helps supply water to the San Francisco Bay Area.
  • D. Montijo Reservoir
    Montijo Reservoir is an artificial lake and water storage facility located within Spain’s Guadiana River basin, used primarily for irrigation, water supply, and regional water management.
  • E. Alcántara Reservoir
    Alcántara Reservoir is a large artificial lake in western Spain, created by damming the Tagus River system and used primarily for hydroelectric power generation, irrigation, and water supply.
  • F. None of above.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e4776588190abb21e5cea79973f completed April 16, 2026, 5:37 p.m.
NER Named-entity recognition batch_69f157535eb48190adbefbb619cb5fcd completed April 29, 2026, 12:56 a.m.
Created at: April 16, 2026, 8:42 p.m.