Triple
T22309325
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | APT-S |
E551470
|
entity |
| Predicate | programme |
P6928
|
FINISHED |
| Object | British Rail Advanced Passenger Train programme |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: British Rail Advanced Passenger Train programme | Statement: [APT-S, programme, British Rail Advanced Passenger Train programme]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: British Rail Advanced Passenger Train programme Context triple: [APT-S, programme, British Rail Advanced Passenger Train programme]
-
A.
British Railways Modernisation Plan
The British Railways Modernisation Plan was a major post-war programme to transform and modernize Britain’s railway network through widespread dieselisation, electrification, and infrastructure upgrades.
-
B.
British Rail InterCity 125
The British Rail InterCity 125 is a high-speed diesel-powered train introduced in the 1970s that became iconic for revolutionizing long-distance rail travel in the UK.
-
C.
Intercity Express Programme
The Intercity Express Programme is a UK government-backed initiative to replace aging high-speed train fleets with modern, faster, and more efficient intercity trains on key rail routes.
-
D.
British Rail Class 55 Deltic
The British Rail Class 55 "Deltic" is a class of iconic high-powered diesel-electric locomotives that hauled express passenger services on Britain’s East Coast Main Line in the 1960s and 1970s.
-
E.
British Rail Class 800
The British Rail Class 800 is a family of bi-mode high-speed intercity trains used in the UK, notably on the Great Western and East Coast Main Lines.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: British Rail Advanced Passenger Train programme Target entity description: The British Rail Advanced Passenger Train programme was a pioneering but ultimately ill-fated British project to develop high-speed tilting trains for the UK rail network in the 1970s and 1980s.
-
A.
British Railways Modernisation Plan
The British Railways Modernisation Plan was a major post-war programme to transform and modernize Britain’s railway network through widespread dieselisation, electrification, and infrastructure upgrades.
-
B.
British Rail InterCity 125
The British Rail InterCity 125 is a high-speed diesel-powered train introduced in the 1970s that became iconic for revolutionizing long-distance rail travel in the UK.
-
C.
Intercity Express Programme
The Intercity Express Programme is a UK government-backed initiative to replace aging high-speed train fleets with modern, faster, and more efficient intercity trains on key rail routes.
-
D.
British Rail Class 55 Deltic
The British Rail Class 55 "Deltic" is a class of iconic high-powered diesel-electric locomotives that hauled express passenger services on Britain’s East Coast Main Line in the 1960s and 1970s.
-
E.
British Rail Class 800
The British Rail Class 800 is a family of bi-mode high-speed intercity trains used in the UK, notably on the Great Western and East Coast Main Lines.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e11e46c0188190800181a4233f28fe |
completed | April 16, 2026, 5:37 p.m. |
| NER | Named-entity recognition | batch_69f1574d53148190a1ec07f849e1ae9d |
completed | April 29, 2026, 12:56 a.m. |
Created at: April 16, 2026, 8:42 p.m.