Triple

T22309051
Position Surface form Disambiguated ID Type / Status
Subject Rio Tietê E551463 entity
Predicate hasDam P8736 FINISHED
Object Barra Bonita Dam NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Barra Bonita Dam | Statement: [Rio Tietê, hasDam, Barra Bonita Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Barra Bonita Dam
Context triple: [Rio Tietê, hasDam, Barra Bonita Dam]
  • A. Barra Bonita Dam chosen
    Barra Bonita Dam is a hydroelectric and navigation dam complex in the state of São Paulo, Brazil, known for regulating the Tietê River and forming the Barra Bonita Reservoir.
  • B. Teles Pires Dam
    Teles Pires Dam is a large hydroelectric power facility on the Teles Pires River in Brazil, built to generate electricity as part of the country’s Amazon basin energy infrastructure.
  • C. Gouvães Dam
    Gouvães Dam is a hydroelectric dam in northern Portugal that forms part of the Tâmega River energy complex, contributing to regional power generation and water management.
  • D. Xingó Dam
    Xingó Dam is a large hydroelectric dam complex in northeastern Brazil that generates power and helps regulate the flow of the São Francisco River.
  • E. São Simão Dam
    São Simão Dam is a large hydroelectric power facility in Brazil known for generating electricity and forming the São Simão Reservoir on the Paranaíba River.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e46c0188190800181a4233f28fe completed April 16, 2026, 5:37 p.m.
NER Named-entity recognition batch_69f1574c8a248190bf5eef5be78381fd completed April 29, 2026, 12:56 a.m.
Created at: April 16, 2026, 8:42 p.m.