Triple

T22308962
Position Surface form Disambiguated ID Type / Status
Subject Swing Bridge E551461 entity
Predicate currentPowerSource P8164 FINISHED
Object electric motors LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: electric motors | Statement: [Swing Bridge, currentPowerSource, electric motors]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: currentPowerSource
Context triple: [Swing Bridge, currentPowerSource, electric motors]
  • A. powerStatus
    Indicates whether an entity is currently powered on, off, or in another defined power state.
  • B. deFactoPowerStatus
    Indicates the actual, practical power or authority status an entity holds in reality, regardless of its formal or legally recognized position.
  • C. hasPowerSource chosen
    Indicates that an entity derives its operational energy or functionality from a specified power source.
  • D. powerCondition
    Indicates that one entity’s ability to function, operate, or exert influence depends on a specified power-related requirement or state being satisfied.
  • E. hasPowerSupplyType
    Indicates that an entity is associated with a specific type or category of power supply it uses or requires.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e46c0188190800181a4233f28fe completed April 16, 2026, 5:37 p.m.
NER Named-entity recognition batch_69f1574c8a248190bf5eef5be78381fd completed April 29, 2026, 12:56 a.m.
PD Predicate disambiguation batch_69e72ffa438481908f80879aef2a589b completed April 21, 2026, 8:06 a.m.
Created at: April 16, 2026, 8:42 p.m.