Triple

T22298170
Position Surface form Disambiguated ID Type / Status
Subject Higalaay Festival E551178 entity
Predicate locatedIn P40 FINISHED
Object Cagayan de Oro NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Cagayan de Oro | Statement: [Higalaay Festival, locatedIn, Cagayan de Oro]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Cagayan de Oro
Context triple: [Higalaay Festival, locatedIn, Cagayan de Oro]
  • A. Cagayan de Oro chosen
    Cagayan de Oro is a highly urbanized city in Northern Mindanao, Philippines, known as a regional economic hub and gateway to the island’s northern corridor.
  • B. Davao City
    Davao City is a major urban center in the southern Philippines known for its economic hub status, proximity to Mount Apo, and reputation as one of the country’s safest and most progressive cities.
  • C. Cotabato City
    Cotabato City is an independent urban center in the southern Philippines known as a key political, economic, and cultural hub in Mindanao.
  • D. Iloilo City
    Iloilo City is a highly urbanized coastal city in the central Philippines known as a commercial, educational, and cultural hub of the Western Visayas region.
  • E. バギオ
    バギオは、フィリピン北部ルソン島の山岳地帯に位置し、冷涼な気候と避暑地としての人気から「夏の首都」とも呼ばれる都市である。
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e45fb848190a1b2ae21296e3a5f completed April 16, 2026, 5:37 p.m.
NER Named-entity recognition batch_69f1572200c88190b9413286136fef15 completed April 29, 2026, 12:56 a.m.
Created at: April 16, 2026, 8:41 p.m.