Triple
T22275644
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | U.S. Highways in Alabama |
E550594
|
entity |
| Predicate | hasRoute |
P4374
|
FINISHED |
| Object | U.S. Route 82 in Alabama |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: U.S. Route 82 in Alabama | Statement: [U.S. Highways in Alabama, hasRoute, U.S. Route 82 in Alabama]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: U.S. Route 82 in Alabama Context triple: [U.S. Highways in Alabama, hasRoute, U.S. Route 82 in Alabama]
-
A.
U.S. Route 72 in Alabama
U.S. Route 72 in Alabama is a major east–west federal highway that traverses the northern part of the state, connecting cities such as Florence, Huntsville, and Scottsboro before continuing into neighboring states.
-
B.
U.S. Route 78 in Alabama
U.S. Route 78 in Alabama is a major east–west federal highway corridor that connects Birmingham with the Georgia state line, serving as an important route for regional travel and commerce.
-
C.
U.S. Route 278 in Alabama
U.S. Route 278 in Alabama is an east–west U.S. Highway that traverses northern Alabama, connecting rural communities and regional cities as part of the broader U.S. Highway System.
-
D.
U.S. Route 84 in Alabama
U.S. Route 84 in Alabama is a major east–west U.S. Highway crossing southern Alabama, connecting cities such as Andalusia, Opp, and Dothan as part of a regional corridor between Mississippi and Georgia.
-
E.
U.S. Route 82 in Georgia
U.S. Route 82 in Georgia is a major east–west highway that traverses the southern part of the state, connecting cities such as Albany, Tifton, and Waycross before continuing into neighboring states.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: U.S. Route 82 in Alabama Target entity description: U.S. Route 82 in Alabama is a major east–west federal highway that traverses the state, connecting key cities and facilitating regional travel and commerce.
-
A.
U.S. Route 72 in Alabama
U.S. Route 72 in Alabama is a major east–west federal highway that traverses the northern part of the state, connecting cities such as Florence, Huntsville, and Scottsboro before continuing into neighboring states.
-
B.
U.S. Route 78 in Alabama
U.S. Route 78 in Alabama is a major east–west federal highway corridor that connects Birmingham with the Georgia state line, serving as an important route for regional travel and commerce.
-
C.
U.S. Route 278 in Alabama
U.S. Route 278 in Alabama is an east–west U.S. Highway that traverses northern Alabama, connecting rural communities and regional cities as part of the broader U.S. Highway System.
-
D.
U.S. Route 84 in Alabama
U.S. Route 84 in Alabama is a major east–west U.S. Highway crossing southern Alabama, connecting cities such as Andalusia, Opp, and Dothan as part of a regional corridor between Mississippi and Georgia.
-
E.
U.S. Route 82 in Georgia
U.S. Route 82 in Georgia is a major east–west highway that traverses the southern part of the state, connecting cities such as Albany, Tifton, and Waycross before continuing into neighboring states.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e11e43d8208190aff4f9cf7f2c2a8a |
completed | April 16, 2026, 5:37 p.m. |
| NER | Named-entity recognition | batch_69f14ea7ebbc8190948e8994e988adb3 |
completed | April 29, 2026, 12:19 a.m. |
Created at: April 16, 2026, 8:40 p.m.