Triple

T22275641
Position Surface form Disambiguated ID Type / Status
Subject U.S. Highways in Alabama E550594 entity
Predicate hasRoute P4374 FINISHED
Object U.S. Route 72 in Alabama NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: U.S. Route 72 in Alabama | Statement: [U.S. Highways in Alabama, hasRoute, U.S. Route 72 in Alabama]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: U.S. Route 72 in Alabama
Context triple: [U.S. Highways in Alabama, hasRoute, U.S. Route 72 in Alabama]
  • A. U.S. Route 29 in Alabama
    U.S. Route 29 in Alabama is a major north–south U.S. Highway that traverses the state, connecting numerous towns and cities as part of a longer multi-state route.
  • B. U.S. Route 98 in Alabama
    U.S. Route 98 in Alabama is a major east–west U.S. Highway that traverses the southern part of the state, connecting coastal and inland communities and serving as an important regional transportation corridor.
  • C. U.S. Route 90 in Alabama
    U.S. Route 90 in Alabama is a major east–west U.S. Highway that runs across southern Alabama, connecting key Gulf Coast communities and serving as an important regional transportation corridor.
  • D. U.S. Route 84 in Alabama
    U.S. Route 84 in Alabama is a major east–west U.S. Highway crossing southern Alabama, connecting cities such as Andalusia, Opp, and Dothan as part of a regional corridor between Mississippi and Georgia.
  • E. U.S. Route 31 in Alabama
    U.S. Route 31 in Alabama is a major north–south highway that runs through the state, connecting cities such as Mobile, Montgomery, and Birmingham while paralleling Interstate 65 for much of its length.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: U.S. Route 72 in Alabama
Target entity description: U.S. Route 72 in Alabama is a major east–west federal highway that traverses the northern part of the state, connecting cities such as Florence, Huntsville, and Scottsboro before continuing into neighboring states.
  • A. U.S. Route 29 in Alabama
    U.S. Route 29 in Alabama is a major north–south U.S. Highway that traverses the state, connecting numerous towns and cities as part of a longer multi-state route.
  • B. U.S. Route 98 in Alabama
    U.S. Route 98 in Alabama is a major east–west U.S. Highway that traverses the southern part of the state, connecting coastal and inland communities and serving as an important regional transportation corridor.
  • C. U.S. Route 90 in Alabama
    U.S. Route 90 in Alabama is a major east–west U.S. Highway that runs across southern Alabama, connecting key Gulf Coast communities and serving as an important regional transportation corridor.
  • D. U.S. Route 84 in Alabama
    U.S. Route 84 in Alabama is a major east–west U.S. Highway crossing southern Alabama, connecting cities such as Andalusia, Opp, and Dothan as part of a regional corridor between Mississippi and Georgia.
  • E. U.S. Route 31 in Alabama
    U.S. Route 31 in Alabama is a major north–south highway that runs through the state, connecting cities such as Mobile, Montgomery, and Birmingham while paralleling Interstate 65 for much of its length.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e43d8208190aff4f9cf7f2c2a8a completed April 16, 2026, 5:37 p.m.
NER Named-entity recognition batch_69f14ea7ebbc8190948e8994e988adb3 completed April 29, 2026, 12:19 a.m.
Created at: April 16, 2026, 8:40 p.m.