Triple
T22275603
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | U.S. Highways in Tennessee |
E550593
|
entity |
| Predicate | hasRoute |
P4374
|
FINISHED |
| Object | U.S. Route 76 in Tennessee |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: U.S. Route 76 in Tennessee | Statement: [U.S. Highways in Tennessee, hasRoute, U.S. Route 76 in Tennessee]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: U.S. Route 76 in Tennessee Context triple: [U.S. Highways in Tennessee, hasRoute, U.S. Route 76 in Tennessee]
-
A.
U.S. Route 72 in Tennessee
U.S. Route 72 in Tennessee is a major east–west U.S. Highway that connects the Mississippi state line to Chattanooga, serving as an important regional corridor in the southern part of the state.
-
B.
U.S. Route 70N in Tennessee
U.S. Route 70N in Tennessee is an east–west U.S. highway that serves as a northern alternate to U.S. Route 70, connecting several communities across the state’s central region.
-
C.
U.S. Route 70S in Tennessee
U.S. Route 70S in Tennessee is an east–west U.S. Highway that serves as an alternate to U.S. Route 70, connecting Nashville with communities in Middle Tennessee.
-
D.
U.S. Route 74 in Tennessee
U.S. Route 74 in Tennessee is a segment of the federal U.S. Highway System that traverses southeastern Tennessee, connecting local communities to neighboring states and major regional routes.
-
E.
U.S. Route 64 in Tennessee
U.S. Route 64 in Tennessee is a major east–west federal highway that traverses the state, connecting cities such as Memphis and Chattanooga while serving as an important regional transportation corridor.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: U.S. Route 76 in Tennessee Target entity description: U.S. Route 76 in Tennessee is a segment of the U.S. Highway System that traverses the southeastern part of the state, connecting local communities and linking Tennessee to neighboring states along its east–west corridor.
-
A.
U.S. Route 72 in Tennessee
U.S. Route 72 in Tennessee is a major east–west U.S. Highway that connects the Mississippi state line to Chattanooga, serving as an important regional corridor in the southern part of the state.
-
B.
U.S. Route 70N in Tennessee
U.S. Route 70N in Tennessee is an east–west U.S. highway that serves as a northern alternate to U.S. Route 70, connecting several communities across the state’s central region.
-
C.
U.S. Route 70S in Tennessee
U.S. Route 70S in Tennessee is an east–west U.S. Highway that serves as an alternate to U.S. Route 70, connecting Nashville with communities in Middle Tennessee.
-
D.
U.S. Route 74 in Tennessee
chosen
U.S. Route 74 in Tennessee is a segment of the federal U.S. Highway System that traverses southeastern Tennessee, connecting local communities to neighboring states and major regional routes.
-
E.
U.S. Route 64 in Tennessee
U.S. Route 64 in Tennessee is a major east–west federal highway that traverses the state, connecting cities such as Memphis and Chattanooga while serving as an important regional transportation corridor.
- F. None of above.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e11e43d8208190aff4f9cf7f2c2a8a |
completed | April 16, 2026, 5:37 p.m. |
| NER | Named-entity recognition | batch_69f14ea7ebbc8190948e8994e988adb3 |
completed | April 29, 2026, 12:19 a.m. |
Created at: April 16, 2026, 8:40 p.m.