Triple

T22275105
Position Surface form Disambiguated ID Type / Status
Subject Burguillo Reservoir E550579 entity
Predicate hasHydroelectricPlant P15311 FINISHED
Object Burguillo Hydroelectric Power Station NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Burguillo Hydroelectric Power Station | Statement: [Burguillo Reservoir, hasHydroelectricPlant, Burguillo Hydroelectric Power Station]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Burguillo Hydroelectric Power Station
Context triple: [Burguillo Reservoir, hasHydroelectricPlant, Burguillo Hydroelectric Power Station]
  • A. La Higuera hydroelectric power plant
    La Higuera hydroelectric power plant is a Chilean hydropower station that forms part of the Tinguiririca hydroelectric complex, generating renewable electricity from the Tinguiririca River.
  • B. Alicurá Hydroelectric Power Station
    Alicurá Hydroelectric Power Station is a major hydroelectric facility in Argentina that generates electricity using water impounded by the Alicurá Dam on the Limay River.
  • C. Fierza Hydroelectric Power Station
    Fierza Hydroelectric Power Station is a major hydroelectric facility in northern Albania, forming part of the Drin River cascade and serving as one of the country’s largest sources of electricity.
  • D. Peligre hydroelectric plant
    The Peligre hydroelectric plant is a major dam and power station in Haiti that provides a significant portion of the country’s electricity by harnessing the flow of the Artibonite River.
  • E. Maria Cristina Hydroelectric Plant
    The Maria Cristina Hydroelectric Plant is a major hydroelectric power facility in the Philippines, known for harnessing the Maria Cristina Falls to supply electricity to Mindanao.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Burguillo Hydroelectric Power Station
Target entity description: Burguillo Hydroelectric Power Station is a hydroelectric facility in Spain that generates electricity using water from the Burguillo Reservoir.
  • A. La Higuera hydroelectric power plant
    La Higuera hydroelectric power plant is a Chilean hydropower station that forms part of the Tinguiririca hydroelectric complex, generating renewable electricity from the Tinguiririca River.
  • B. Alicurá Hydroelectric Power Station
    Alicurá Hydroelectric Power Station is a major hydroelectric facility in Argentina that generates electricity using water impounded by the Alicurá Dam on the Limay River.
  • C. Fierza Hydroelectric Power Station
    Fierza Hydroelectric Power Station is a major hydroelectric facility in northern Albania, forming part of the Drin River cascade and serving as one of the country’s largest sources of electricity.
  • D. Peligre hydroelectric plant
    The Peligre hydroelectric plant is a major dam and power station in Haiti that provides a significant portion of the country’s electricity by harnessing the flow of the Artibonite River.
  • E. Maria Cristina Hydroelectric Plant
    The Maria Cristina Hydroelectric Plant is a major hydroelectric power facility in the Philippines, known for harnessing the Maria Cristina Falls to supply electricity to Mindanao.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e43d8208190aff4f9cf7f2c2a8a completed April 16, 2026, 5:37 p.m.
NER Named-entity recognition batch_69f14ea643d48190985371d01aac7bfc completed April 29, 2026, 12:19 a.m.
Created at: April 16, 2026, 8:40 p.m.