Triple

T22266612
Position Surface form Disambiguated ID Type / Status
Subject Yser estuary locks E550367 entity
Predicate instanceOf P0 FINISHED
Object water management complex C5154 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: water management complex
Context triple: [Yser estuary locks, instanceOf, water management complex]
  • A. water reservoir complex
    A water reservoir complex is an integrated system of interconnected reservoirs, infrastructure, and control facilities designed to store, manage, and distribute water for purposes such as supply, irrigation, flood control, and power generation.
  • B. water management project
    A water management project is an organized initiative that plans, develops, and operates systems and practices to sustainably collect, store, distribute, and protect water resources for human and environmental needs.
  • C. water management structure chosen
    A water management structure is a constructed facility or system designed to control, store, convey, or regulate the quantity and movement of water in natural or built environments.
  • D. hydroelectric power complex
    A hydroelectric power complex is an integrated facility that harnesses the energy of flowing or falling water—using dams, reservoirs, turbines, and generators—to produce and distribute electrical power.
  • E. flood control facility
    A flood control facility is an engineered structure or system designed to manage, divert, store, or reduce excess water flow to prevent or mitigate flooding in surrounding areas.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e43d8208190aff4f9cf7f2c2a8a completed April 16, 2026, 5:37 p.m.
Created at: April 16, 2026, 8:39 p.m.