Triple
T22265160
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Ladera Center |
E550331
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | commercial plaza |
C2700
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: commercial plaza Context triple: [Ladera Center, instanceOf, commercial plaza]
-
A.
commercial park
A commercial park is a planned area of land developed with multiple business facilities—such as offices, retail spaces, and light industrial units—designed to support commercial activities within a cohesive, often landscaped environment.
-
B.
urban plaza
chosen
An urban plaza is a publicly accessible open space within a city, typically surrounded by buildings and streets, designed to support social interaction, circulation, and civic activities.
-
C.
Commercial area
A commercial area is a designated zone within a city or region primarily used for business activities such as retail, offices, services, and entertainment.
-
D.
shopping centre
A shopping centre is a large complex of retail stores, services, and often entertainment facilities planned and managed as a single commercial property.
-
E.
commercial building site
A commercial building site is a designated parcel of land prepared and used for the construction, operation, or redevelopment of structures intended primarily for business, retail, office, or other non-residential commercial activities.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e11e43d8208190aff4f9cf7f2c2a8a |
completed | April 16, 2026, 5:37 p.m. |
Created at: April 16, 2026, 8:39 p.m.