Triple

T22264888
Position Surface form Disambiguated ID Type / Status
Subject Crystal Mill E550323 entity
Predicate alsoKnownAs P39 FINISHED
Object Sheep Mountain Power House NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Sheep Mountain Power House | Statement: [Crystal Mill, alsoKnownAs, Sheep Mountain Power House]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Sheep Mountain Power House
Context triple: [Crystal Mill, alsoKnownAs, Sheep Mountain Power House]
  • A. North Star Mine Powerhouse
    The North Star Mine Powerhouse is a historic industrial building in Grass Valley, California, that once supplied electrical power to one of the region’s major gold mines and now serves as a preserved heritage landmark.
  • B. White Rock Powerhouse
    White Rock Powerhouse is a hydroelectric generating facility that forms part of the Upper American River Project in California, producing electricity from the river’s water resources.
  • C. Holm Powerhouse
    Holm Powerhouse is a hydroelectric generating station within California’s Hetch Hetchy Power System that converts water from the Hetch Hetchy aqueduct into electricity.
  • D. Shanan Power House
    Shanan Power House is a hydroelectric power station in Himachal Pradesh, India, that generates electricity using the waters of the Uhl River.
  • E. Oak Grove Powerhouse
    Oak Grove Powerhouse is a hydroelectric generating station that converts water released from Oak Grove Dam into electrical power.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Sheep Mountain Power House
Target entity description: Sheep Mountain Power House, better known as the Crystal Mill, is a historic 19th-century wooden powerhouse perched dramatically above the Crystal River in Colorado and is one of the most photographed landmarks in the state.
  • A. North Star Mine Powerhouse
    The North Star Mine Powerhouse is a historic industrial building in Grass Valley, California, that once supplied electrical power to one of the region’s major gold mines and now serves as a preserved heritage landmark.
  • B. White Rock Powerhouse
    White Rock Powerhouse is a hydroelectric generating facility that forms part of the Upper American River Project in California, producing electricity from the river’s water resources.
  • C. Holm Powerhouse
    Holm Powerhouse is a hydroelectric generating station within California’s Hetch Hetchy Power System that converts water from the Hetch Hetchy aqueduct into electricity.
  • D. Shanan Power House
    Shanan Power House is a hydroelectric power station in Himachal Pradesh, India, that generates electricity using the waters of the Uhl River.
  • E. Oak Grove Powerhouse
    Oak Grove Powerhouse is a hydroelectric generating station that converts water released from Oak Grove Dam into electrical power.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e43d8208190aff4f9cf7f2c2a8a completed April 16, 2026, 5:37 p.m.
NER Named-entity recognition batch_69f141ba5c9481909e24067133918ae2 completed April 28, 2026, 11:24 p.m.
Created at: April 16, 2026, 8:39 p.m.