Triple

T22261715
Position Surface form Disambiguated ID Type / Status
Subject Civil Aeronautics Board Sunset Act of 1984 E550241 entity
Predicate instanceOf P0 FINISHED
Object transportation-related legislation C46021 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: transportation-related legislation
Context triple: [Civil Aeronautics Board Sunset Act of 1984, instanceOf, transportation-related legislation]
  • A. transportation safety law
    Transportation safety law is the body of legal rules and regulations designed to prevent accidents and injuries in all modes of transport by setting safety standards, enforcing compliance, and assigning liability for violations.
  • B. railroad legislation
    Railroad legislation comprises the body of laws and regulations governing the construction, operation, safety, economics, and public responsibilities of railway systems.
  • C. transportation funding authorization act
    A transportation funding authorization act is a legislative measure that approves and allocates financial resources for the planning, construction, operation, and maintenance of transportation infrastructure and related programs over a specified period.
  • D. transportation funding measure
    A transportation funding measure is a policy instrument, often a ballot initiative or legislative act, that authorizes and allocates dedicated revenue sources to plan, build, operate, and maintain transportation infrastructure and services.
  • E. rail safety legislation
    Rail safety legislation comprises the laws and regulations that govern the safe design, operation, maintenance, and oversight of railway systems to protect passengers, workers, and the public.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e42adb8819087714772ea606709 completed April 16, 2026, 5:37 p.m.
Created at: April 16, 2026, 8:39 p.m.