Triple
T22256669
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Meistersaal |
E550110
|
entity |
| Predicate | partOf |
P40
|
FINISHED |
| Object | Hansa Tonstudio complex |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Hansa Tonstudio complex | Statement: [Meistersaal, partOf, Hansa Tonstudio complex]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Hansa Tonstudio complex Context triple: [Meistersaal, partOf, Hansa Tonstudio complex]
-
A.
Prora complex
The Prora complex is a massive seaside resort on Germany’s Baltic Sea coast, originally built by the Nazis as a “Strength Through Joy” vacation facility and later repurposed for various modern uses.
-
B.
Friedrichstadtpassagen complex
The Friedrichstadtpassagen complex is a prominent mixed-use architectural ensemble in central Berlin that houses upscale retail, offices, and cultural spaces, including the Galeries Lafayette Berlin.
-
C.
Hamburg Towers
Hamburg Towers is a professional basketball club based in Hamburg, Germany, competing in the country’s top-tier Basketball Bundesliga.
-
D.
EZB-Tower complex
The EZB-Tower complex is the high-rise headquarters of the European Central Bank located in Frankfurt’s Ostend district, notable for its modern architecture and prominent position on the city skyline.
-
E.
Waldspirale residential complex
The Waldspirale residential complex is a distinctive, spiral-shaped housing development in Darmstadt, Germany, designed by artist Friedensreich Hundertwasser and known for its colorful façade, irregular windows, and rooftop forest.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Hansa Tonstudio complex Target entity description: The Hansa Tonstudio complex is a renowned Berlin recording studio facility famous for hosting influential sessions by artists such as David Bowie, Depeche Mode, and U2.
-
A.
Prora complex
The Prora complex is a massive seaside resort on Germany’s Baltic Sea coast, originally built by the Nazis as a “Strength Through Joy” vacation facility and later repurposed for various modern uses.
-
B.
Friedrichstadtpassagen complex
The Friedrichstadtpassagen complex is a prominent mixed-use architectural ensemble in central Berlin that houses upscale retail, offices, and cultural spaces, including the Galeries Lafayette Berlin.
-
C.
Hamburg Towers
Hamburg Towers is a professional basketball club based in Hamburg, Germany, competing in the country’s top-tier Basketball Bundesliga.
-
D.
EZB-Tower complex
The EZB-Tower complex is the high-rise headquarters of the European Central Bank located in Frankfurt’s Ostend district, notable for its modern architecture and prominent position on the city skyline.
-
E.
Waldspirale residential complex
The Waldspirale residential complex is a distinctive, spiral-shaped housing development in Darmstadt, Germany, designed by artist Friedensreich Hundertwasser and known for its colorful façade, irregular windows, and rooftop forest.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e11e42adb8819087714772ea606709 |
completed | April 16, 2026, 5:37 p.m. |
| NER | Named-entity recognition | batch_69f138c314308190a5eea84e1750158a |
completed | April 28, 2026, 10:46 p.m. |
Created at: April 16, 2026, 8:39 p.m.