Triple
T22256391
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Nine Inch Nails – Broken (engineering/mixing) |
E550104
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | creative contribution to an EP |
C27104
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: creative contribution to an EP Context triple: [Nine Inch Nails – Broken (engineering/mixing), instanceOf, creative contribution to an EP]
-
A.
collaborative EP
A collaborative EP is a short music release created jointly by two or more artists who share creative input, performance, and production across the project’s tracks.
-
B.
track on EP
A track on an EP is an individual audio recording or song that forms part of the EP’s overall collection, contributing to its artistic theme and runtime.
-
C.
acoustic EP
An acoustic EP is a short music release featuring a small collection of primarily acoustic-based recordings that showcase an artist’s songs in a more stripped-down, intimate format than a full-length album.
-
D.
musical contribution
chosen
A musical contribution is any creative or performative input—such as composing, arranging, performing, or producing—that adds to the creation, interpretation, or presentation of a musical work.
-
E.
tribute single
A tribute single is a standalone song release created to honor or commemorate a particular person, group, event, or influence, often following a death or significant milestone.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e11e42adb8819087714772ea606709 |
completed | April 16, 2026, 5:37 p.m. |
Created at: April 16, 2026, 8:39 p.m.