Triple
T22256390
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Nine Inch Nails – Broken (engineering/mixing) |
E550104
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | record production role |
C431
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: record production role Context triple: [Nine Inch Nails – Broken (engineering/mixing), instanceOf, record production role]
-
A.
record production project
A record production project is a coordinated endeavor that plans, organizes, and manages all creative, technical, and logistical activities required to produce and deliver a finished recorded music release.
-
B.
record producer
chosen
A record producer is a music industry professional who oversees and manages the recording process, shaping the sound, arrangement, and overall artistic direction of a song or album.
-
C.
rum producer
A rum producer is an entity that manufactures rum by fermenting and distilling sugarcane-derived materials, then aging, blending, and bottling the spirit for distribution and sale.
-
D.
production assistant
A production assistant is an entry-level crew member who supports various logistical, administrative, and on-set tasks to help ensure a film, television, or media production runs smoothly.
-
E.
record executive
A record executive is a high-level professional in the music industry responsible for discovering talent, overseeing recording projects, and managing the business and strategic direction of artists and labels.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e11e42adb8819087714772ea606709 |
completed | April 16, 2026, 5:37 p.m. |
Created at: April 16, 2026, 8:39 p.m.