Triple

T22256390
Position Surface form Disambiguated ID Type / Status
Subject Nine Inch Nails – Broken (engineering/mixing) E550104 entity
Predicate instanceOf P0 FINISHED
Object record production role C431 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: record production role
Context triple: [Nine Inch Nails – Broken (engineering/mixing), instanceOf, record production role]
  • A. record production project
    A record production project is a coordinated endeavor that plans, organizes, and manages all creative, technical, and logistical activities required to produce and deliver a finished recorded music release.
  • B. record producer chosen
    A record producer is a music industry professional who oversees and manages the recording process, shaping the sound, arrangement, and overall artistic direction of a song or album.
  • C. rum producer
    A rum producer is an entity that manufactures rum by fermenting and distilling sugarcane-derived materials, then aging, blending, and bottling the spirit for distribution and sale.
  • D. production assistant
    A production assistant is an entry-level crew member who supports various logistical, administrative, and on-set tasks to help ensure a film, television, or media production runs smoothly.
  • E. record executive
    A record executive is a high-level professional in the music industry responsible for discovering talent, overseeing recording projects, and managing the business and strategic direction of artists and labels.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e42adb8819087714772ea606709 completed April 16, 2026, 5:37 p.m.
Created at: April 16, 2026, 8:39 p.m.