Triple

T22236980
Position Surface form Disambiguated ID Type / Status
Subject Port of Vienna E549616 entity
Predicate waterwayCorridor P5565 FINISHED
Object Rhine–Main–Danube corridor NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Rhine–Main–Danube corridor | Statement: [Port of Vienna, waterwayCorridor, Rhine–Main–Danube corridor]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Rhine–Main–Danube corridor
Context triple: [Port of Vienna, waterwayCorridor, Rhine–Main–Danube corridor]
  • A. Danube–Lake Constance corridor
    The Danube–Lake Constance corridor is a key European transport axis linking the Danube region with Lake Constance, used for both rail and road connections across southern Germany.
  • B. Baltic-Adriatic Corridor
    The Baltic-Adriatic Corridor is a major trans-European transport route linking ports on the Baltic Sea with those on the Adriatic, facilitating north–south trade and mobility across Central Europe.
  • C. Rhine–Main–Danube Canal chosen
    The Rhine–Main–Danube Canal is a major European waterway that links the North Sea to the Black Sea by connecting the Rhine, Main, and Danube river systems for continuous inland navigation.
  • D. Rhine motorway corridor
    The Rhine motorway corridor is a major cross-border transport route along the Rhine River that facilitates road traffic and economic integration between regions such as those within the Eurodistrict PAMINA.
  • E. west–east European inland waterway corridor
    The west–east European inland waterway corridor is a major trans-European transport route that links key inland waterways across central Europe, facilitating long-distance east–west freight and passenger navigation.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: waterwayCorridor
Context triple: [Port of Vienna, waterwayCorridor, Rhine–Main–Danube corridor]
  • A. waterwaySystem
    Indicates that one entity is part of, or belongs to, a connected network of waterways associated with another entity.
  • B. waterwayServed chosen
    Indicates that a place, facility, or infrastructure is served by, connected to, or functionally supported by a particular waterway.
  • C. waterwayContext
    Indicates that one entity is a waterway whose characteristics, usage, or significance are defined or influenced by its surrounding geographic or environmental context.
  • D. waterwayClass
    Indicates the classification or type of a waterway based on its navigational, functional, or physical characteristics.
  • E. waterwayThrough
    Indicates that a waterway (such as a river or canal) passes through or traverses a specified geographic area or feature.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e4102b881909cf47d3768e25c19 completed April 16, 2026, 5:37 p.m.
NER Named-entity recognition batch_69f12bf7b1d8819091087dcfdb2e967c completed April 28, 2026, 9:51 p.m.
PD Predicate disambiguation batch_69e71b5177d881908f90abde14ada7dc completed April 21, 2026, 6:38 a.m.
Created at: April 16, 2026, 8:38 p.m.