Triple
T22231105
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Puttalam Line |
E549467
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | railway line in Sri Lanka |
C3787
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: railway line in Sri Lanka Context triple: [Puttalam Line, instanceOf, railway line in Sri Lanka]
-
A.
railway line
chosen
A railway line is a fixed transportation route consisting of tracks, signaling, and related infrastructure along which trains operate between defined locations.
-
B.
railway line in the Philippines
A railway line in the Philippines is a fixed transportation corridor consisting of tracks, stations, and related infrastructure used for the operation of passenger and/or freight trains within the Philippine archipelago.
-
C.
railroad line
A railroad line is a fixed route consisting of tracks and associated infrastructure over which trains operate to transport passengers or freight between locations.
-
D.
public railway
A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
-
E.
railway line in Portugal
A railway line in Portugal is a defined rail corridor within the Portuguese rail network, consisting of tracks, infrastructure, and associated facilities that support train operations between specified locations.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e11e4102b881909cf47d3768e25c19 |
completed | April 16, 2026, 5:37 p.m. |
Created at: April 16, 2026, 8:38 p.m.