Triple

T22219023
Position Surface form Disambiguated ID Type / Status
Subject A13 motorway (Portugal) E549156 entity
Predicate endJunction P50561 FINISHED
Object A1 motorway NE NERFINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: A1 motorway | Statement: [A13 motorway (Portugal), endJunction, A1 motorway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: A1 motorway
Context triple: [A13 motorway (Portugal), endJunction, A1 motorway]
  • A. A1 motorway
    The A1 motorway is a major Swiss highway that runs across the country, connecting key cities such as Geneva, Lausanne, Bern, and Zurich.
  • B. A1 motorway
    The A1 motorway is a major French highway connecting Paris to Lille and serving as a key route toward Belgium and northern Europe.
  • C. A1 motorway
    The A1 motorway is a major German autobahn running north–south that connects key cities and regions across the country.
  • D. A1 motorway
    The A1 motorway is a major Croatian highway that runs from Zagreb toward the Dalmatian coast, serving as the country’s primary north–south transport corridor.
  • E. A1 motorway
    The A1 motorway is a major Austrian highway that forms part of the primary east–west route connecting Vienna with Salzburg and the German border.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: A1 motorway
Target entity description: The A1 motorway is Portugal’s primary north–south highway, linking Lisbon to Porto and serving as the country’s most important road corridor.
  • A. A1 motorway chosen
    The A1 motorway is a major Portuguese highway that forms the primary north–south route between Lisbon and Porto, passing near cities such as Santarém.
  • B. A1 motorway
    The A1 motorway, also known as the Autostrada del Sole, is a major Italian highway that runs north–south connecting Milan to Naples and serving as one of the country’s primary transport arteries.
  • C. A1 motorway
    The A1 motorway is a major French highway connecting Paris to Lille and serving as a key route toward Belgium and northern Europe.
  • D. A1 motorway
    The A1 motorway is a major north–south highway in Poland that forms part of the European route network, connecting key industrial and urban centers across the country.
  • E. A1 motorway
    The A1 motorway is a major Croatian highway that runs from Zagreb toward the Dalmatian coast, serving as the country’s primary north–south transport corridor.
  • F. None of above.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: endJunction
Context triple: [A13 motorway (Portugal), endJunction, A1 motorway]
  • A. terminusJunction chosen
    Indicates a relationship where a route, line, or path ends at a junction point that serves as its terminal connection.
  • B. endOf
    Indicates that one entity marks the terminating point or final boundary of another entity, event, or interval.
  • C. servesJunction
    Indicates that one element functions as a connecting or branching point where multiple other elements meet or intersect.
  • D. wasJunctionFor
    Indicates that one entity functioned as a junction or connecting point for another entity, typically serving as an intersection or hub through which the other entity passed or was routed.
  • E. endName
    Indicates that one entity serves as the ending or final name/designation associated with another entity.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e403d6481909a94d0aaf157f6ef completed April 16, 2026, 5:37 p.m.
NER Named-entity recognition batch_69f12b8edd288190a49f10e009122057 completed April 28, 2026, 9:50 p.m.
PD Predicate disambiguation batch_69e71b4dcc408190a30429fb08fcf39e completed April 21, 2026, 6:38 a.m.
Created at: April 16, 2026, 8:37 p.m.