Triple
T22218968
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | A33 motorway (Portugal) |
E549154
|
entity |
| Predicate | hasJunctionWith |
P1018
|
FINISHED |
| Object | A38 motorway (Portugal) |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: A38 motorway (Portugal) | Statement: [A33 motorway (Portugal), hasJunctionWith, A38 motorway (Portugal)]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: A38 motorway (Portugal) Context triple: [A33 motorway (Portugal), hasJunctionWith, A38 motorway (Portugal)]
-
A.
A30 motorway (Portugal)
The A30 motorway in Portugal is a key highway that forms part of the country’s national road network, facilitating regional and intercity traffic.
-
B.
A3 motorway (Portugal)
The A3 motorway in Portugal is a major north–south highway connecting Porto to the northern border with Spain, forming part of an important international transport corridor.
-
C.
A33 motorway (Portugal)
The A33 motorway in Portugal is a major suburban and regional highway serving the Lisbon metropolitan area, improving connectivity along the south bank of the Tagus River.
-
D.
A32 motorway (Portugal)
The A32 motorway in Portugal is a major north–south highway in the Porto metropolitan area that helps connect inland regions with the coastal A1 and A29 motorways.
-
E.
A28 motorway (Portugal)
The A28 motorway in Portugal is a major coastal highway linking Porto to Viana do Castelo and the northern border region, serving as a key route for traffic along the northwest Atlantic corridor.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: A38 motorway (Portugal) Target entity description: The A38 motorway in Portugal is a short urban expressway serving the Lisbon metropolitan area, providing a key link between local suburbs and major regional routes.
-
A.
A30 motorway (Portugal)
The A30 motorway in Portugal is a key highway that forms part of the country’s national road network, facilitating regional and intercity traffic.
-
B.
A3 motorway (Portugal)
The A3 motorway in Portugal is a major north–south highway connecting Porto to the northern border with Spain, forming part of an important international transport corridor.
-
C.
A33 motorway (Portugal)
The A33 motorway in Portugal is a major suburban and regional highway serving the Lisbon metropolitan area, improving connectivity along the south bank of the Tagus River.
-
D.
A32 motorway (Portugal)
The A32 motorway in Portugal is a major north–south highway in the Porto metropolitan area that helps connect inland regions with the coastal A1 and A29 motorways.
-
E.
A28 motorway (Portugal)
The A28 motorway in Portugal is a major coastal highway linking Porto to Viana do Castelo and the northern border region, serving as a key route for traffic along the northwest Atlantic corridor.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e11e403d6481909a94d0aaf157f6ef |
completed | April 16, 2026, 5:37 p.m. |
| NER | Named-entity recognition | batch_69f12b8edd288190a49f10e009122057 |
completed | April 28, 2026, 9:50 p.m. |
Created at: April 16, 2026, 8:37 p.m.