Triple

T22216691
Position Surface form Disambiguated ID Type / Status
Subject Upper American River Project E549090 entity
Predicate hasPart P35 FINISHED
Object Afterbay Dam NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Afterbay Dam | Statement: [Upper American River Project, hasPart, Afterbay Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Afterbay Dam
Context triple: [Upper American River Project, hasPart, Afterbay Dam]
  • A. Kajaki Dam
    Kajaki Dam is a major hydroelectric and irrigation dam on the Helmand River in southern Afghanistan, known both for its strategic importance and as the site of significant military activity during the Afghan conflict.
  • B. Oahe Dam
    Oahe Dam is a large earth-fill dam on the Missouri River in South Dakota, forming Lake Oahe, one of the largest man-made reservoirs in the United States and a major source of hydroelectric power, irrigation, and flood control.
  • C. Megget Dam
    Megget Dam is a major earthfill embankment dam in the Scottish Borders that impounds the Megget Reservoir, an important source of drinking water for Edinburgh and the surrounding region.
  • D. Yonki Dam
    Yonki Dam is a major hydroelectric dam in Papua New Guinea that supplies significant power to the country’s highlands region.
  • E. Los Reyunos Dam
    Los Reyunos Dam is a hydroelectric and recreational reservoir complex in Mendoza Province, Argentina, known for its scenic canyon setting and water sports activities.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Afterbay Dam
Target entity description: Afterbay Dam is a regulating dam on the American River in California that helps manage water flows and storage as part of the Upper American River hydroelectric system.
  • A. Kajaki Dam
    Kajaki Dam is a major hydroelectric and irrigation dam on the Helmand River in southern Afghanistan, known both for its strategic importance and as the site of significant military activity during the Afghan conflict.
  • B. Oahe Dam
    Oahe Dam is a large earth-fill dam on the Missouri River in South Dakota, forming Lake Oahe, one of the largest man-made reservoirs in the United States and a major source of hydroelectric power, irrigation, and flood control.
  • C. Megget Dam
    Megget Dam is a major earthfill embankment dam in the Scottish Borders that impounds the Megget Reservoir, an important source of drinking water for Edinburgh and the surrounding region.
  • D. Yonki Dam
    Yonki Dam is a major hydroelectric dam in Papua New Guinea that supplies significant power to the country’s highlands region.
  • E. Los Reyunos Dam
    Los Reyunos Dam is a hydroelectric and recreational reservoir complex in Mendoza Province, Argentina, known for its scenic canyon setting and water sports activities.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e3f7e04819089806d81d5ac431e completed April 16, 2026, 5:37 p.m.
NER Named-entity recognition batch_69f12b8c9d488190a59f571862997304 completed April 28, 2026, 9:50 p.m.
Created at: April 16, 2026, 8:37 p.m.