Triple
T22216685
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Upper American River Project |
E549090
|
entity |
| Predicate | hasPart |
P35
|
FINISHED |
| Object | Brush Creek Powerhouse |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Brush Creek Powerhouse | Statement: [Upper American River Project, hasPart, Brush Creek Powerhouse]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Brush Creek Powerhouse Context triple: [Upper American River Project, hasPart, Brush Creek Powerhouse]
-
A.
Slab Creek Powerhouse
Slab Creek Powerhouse is a hydroelectric generating facility on the American River in California that forms part of the Upper American River Project’s network of dams and power plants.
-
B.
South Fork Powerhouse
South Fork Powerhouse is a hydroelectric generating station that harnesses the flow of the South Fork Feather River to produce electricity.
-
C.
Tiger Creek Powerhouse
Tiger Creek Powerhouse is a hydroelectric generating facility located on California’s North Fork Mokelumne River, producing electricity from the river’s flow.
-
D.
Jones Fork Powerhouse
Jones Fork Powerhouse is a hydroelectric generating facility that forms part of the Upper American River Project in California, converting water flow into electrical power.
-
E.
Salt Springs Powerhouse
Salt Springs Powerhouse is a hydroelectric generating facility located on California’s North Fork Mokelumne River, producing electricity from the river’s flow.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Brush Creek Powerhouse Target entity description: Brush Creek Powerhouse is a hydroelectric generating facility that forms part of the Upper American River Project in California, contributing to regional renewable power production.
-
A.
Slab Creek Powerhouse
Slab Creek Powerhouse is a hydroelectric generating facility on the American River in California that forms part of the Upper American River Project’s network of dams and power plants.
-
B.
South Fork Powerhouse
South Fork Powerhouse is a hydroelectric generating station that harnesses the flow of the South Fork Feather River to produce electricity.
-
C.
Tiger Creek Powerhouse
Tiger Creek Powerhouse is a hydroelectric generating facility located on California’s North Fork Mokelumne River, producing electricity from the river’s flow.
-
D.
Jones Fork Powerhouse
Jones Fork Powerhouse is a hydroelectric generating facility that forms part of the Upper American River Project in California, converting water flow into electrical power.
-
E.
Salt Springs Powerhouse
Salt Springs Powerhouse is a hydroelectric generating facility located on California’s North Fork Mokelumne River, producing electricity from the river’s flow.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e11e3f7e04819089806d81d5ac431e |
completed | April 16, 2026, 5:37 p.m. |
| NER | Named-entity recognition | batch_69f12b8c9d488190a59f571862997304 |
completed | April 28, 2026, 9:50 p.m. |
Created at: April 16, 2026, 8:37 p.m.