Triple

T22183384
Position Surface form Disambiguated ID Type / Status
Subject Wien Mitte – Landstraße station E548228 entity
Predicate connectsWith P37 FINISHED
Object U4 line NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: U4 line | Statement: [Wien Mitte – Landstraße station, connectsWith, U4 line]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: U4 line
Context triple: [Wien Mitte – Landstraße station, connectsWith, U4 line]
  • A. U4 line
    The U4 line is one of Berlin's U-Bahn subway lines, running a short route in the inner city and connecting key stations including Nollendorfplatz.
  • B. U5 line
    The U5 line is a major Berlin U-Bahn route running east–west that connects central hubs like Alexanderplatz with eastern districts of the city.
  • C. U1 line
    The U1 line is a route of the Frankfurt U-Bahn rapid transit system that connects central Frankfurt with several northern suburbs.
  • D. U1 line
    The U1 line is one of Berlin’s U-Bahn metro lines, running primarily east–west and serving central districts including Friedrichshain-Kreuzberg.
  • E. U6 line
    The U6 line is a route of the Frankfurt U-Bahn rapid transit system that connects various districts across the city, including central hubs such as Hauptwache.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: U4 line
Target entity description: The U4 line is one of Vienna's main underground metro lines, running along the Wien River and connecting several key districts and transport hubs across the city.
  • A. U4 line
    The U4 line is one of Berlin's U-Bahn subway lines, running a short route in the inner city and connecting key stations including Nollendorfplatz.
  • B. U5 line
    The U5 line is a major Berlin U-Bahn route running east–west that connects central hubs like Alexanderplatz with eastern districts of the city.
  • C. U1 line
    The U1 line is a route of the Frankfurt U-Bahn rapid transit system that connects central Frankfurt with several northern suburbs.
  • D. U1 line
    The U1 line is one of Berlin’s U-Bahn metro lines, running primarily east–west and serving central districts including Friedrichshain-Kreuzberg.
  • E. U6 line
    The U6 line is a route of the Frankfurt U-Bahn rapid transit system that connects various districts across the city, including central hubs such as Hauptwache.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e3e0c7c8190b30d278845e2497e completed April 16, 2026, 5:37 p.m.
NER Named-entity recognition batch_69f12aa687808190b9959d4e91db948a completed April 28, 2026, 9:46 p.m.
Created at: April 16, 2026, 8:35 p.m.