Triple

T22182216
Position Surface form Disambiguated ID Type / Status
Subject OSGB grid E548197 entity
Predicate alsoKnownAs P39 FINISHED
Object OS National Grid NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: OS National Grid | Statement: [OSGB grid, alsoKnownAs, OS National Grid]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: OS National Grid
Context triple: [OSGB grid, alsoKnownAs, OS National Grid]
  • A. OS National Grid chosen
    OS National Grid is the national coordinate reference system used in Great Britain for accurately mapping and locating geographic features.
  • B. National Grid
    National Grid is a major British multinational electricity and gas utility company responsible for operating and maintaining the high-voltage power transmission network in Great Britain.
  • C. North Eastern Regional Grid
    The North Eastern Regional Grid is a major power transmission network that supplies and coordinates electricity across India’s northeastern states as part of the national grid system.
  • D. Northern Powergrid
    Northern Powergrid is a UK-based electricity distribution network operator responsible for delivering power to homes and businesses across the North East, Yorkshire, and northern Lincolnshire.
  • E. Indian national grid
    The Indian national grid is the countrywide interconnected power transmission network that enables electricity generated across India to be distributed reliably and efficiently to consumers in all regions.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e3d53f88190a2b690e3f25bb062 completed April 16, 2026, 5:37 p.m.
NER Named-entity recognition batch_69f12aa5998081909ff35f8b5df4f92f completed April 28, 2026, 9:46 p.m.
Created at: April 16, 2026, 8:35 p.m.