Triple

T22181808
Position Surface form Disambiguated ID Type / Status
Subject K9 Thunder export configuration for Norway E548186 entity
Predicate instanceOf P0 FINISHED
Object artillery system configuration C9295 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: artillery system configuration
Context triple: [K9 Thunder export configuration for Norway, instanceOf, artillery system configuration]
  • A. artillery weapon component
    An artillery weapon component is a physical part or subsystem of an artillery piece that contributes to its functions of aiming, loading, firing, stabilizing, or supporting the weapon system.
  • B. counter-rocket artillery and mortar system
    A counter-rocket, artillery, and mortar (C-RAM) system is an integrated defensive weapon system designed to detect, track, and intercept incoming rockets, artillery shells, and mortar rounds in real time to protect designated areas and assets.
  • C. weapon system
    A weapon system is an integrated set of components, technologies, and processes designed to detect, engage, and neutralize targets through the controlled application of force.
  • D. truck-mounted artillery system chosen
    A truck-mounted artillery system is a mobile weapons platform that integrates heavy artillery guns or rocket launchers onto a wheeled truck chassis to provide rapid, long-range fire support with high strategic and tactical mobility.
  • E. artillery turret design
    Artillery turret design is the conceptual and engineering process of configuring a protected, rotating weapons mount that optimizes firepower, accuracy, crew safety, and integration with a vehicle or structure.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e3d53f88190a2b690e3f25bb062 completed April 16, 2026, 5:37 p.m.
Created at: April 16, 2026, 8:35 p.m.