Triple

T22180627
Position Surface form Disambiguated ID Type / Status
Subject Paris–Mulhouse railway E548157 entity
Predicate lineNumber P1864 FINISHED
Object Paris–Mulhouse line NE NERFINISHED

Disambiguation candidates (1 decision)

The exact options the model was shown at each disambiguation step, with the option it chose highlighted — the evidence behind this triple's disambiguated ids.

NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Paris–Mulhouse line
Context triple: [Paris–Mulhouse railway, lineNumber, Paris–Mulhouse line]
  • A. Paris–Mulhouse railway chosen
    The Paris–Mulhouse railway is a major French rail line connecting the capital Paris with the eastern city of Mulhouse, serving as an important corridor for both passenger and freight transport.
  • B. Strasbourg–Mulhouse railway
    The Strasbourg–Mulhouse railway is a major rail line in northeastern France that connects the cities of Strasbourg and Mulhouse, forming an important corridor for regional and international passenger and freight traffic.
  • C. Paris–Strasbourg railway
    The Paris–Strasbourg railway is a major French mainline route connecting the capital Paris with the eastern city of Strasbourg, serving as a key corridor for both passenger and freight traffic.
  • D. Mulhouse–Belfort railway
    The Mulhouse–Belfort railway is a rail line in eastern France that connects the cities of Mulhouse and Belfort, serving as an important regional passenger and freight corridor.
  • E. Mulhouse–Thann railway
    The Mulhouse–Thann railway is a regional rail line in eastern France that connects the city of Mulhouse with the town of Thann in the Alsace region.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

Stage Batch ID Job type Status
creating batch_69e11e3d53f88190a2b690e3f25bb062 elicitation completed
NER batch_69f12aa4d4ac8190922b919c15623963 ner completed
Created at: April 16, 2026, 8:35 p.m.