Triple

T22180560
Position Surface form Disambiguated ID Type / Status
Subject French railway network E548156 entity
Predicate mainHighSpeedService P35275 FINISHED
Object TGV NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: TGV | Statement: [French railway network, mainHighSpeedService, TGV]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: TGV
Context triple: [French railway network, mainHighSpeedService, TGV]
  • A. TGV chosen
    TGV is France’s high-speed intercity train service, renowned for rapid connections between major cities such as Paris and Lille.
  • B. TGV INOUI
    TGV INOUI is SNCF’s premium high-speed train service in France, offering upgraded comfort, amenities, and service compared to standard TGV trains.
  • C. TGV Est
    TGV Est is a French high-speed train service connecting Paris with eastern France and neighboring European countries such as Germany, Luxembourg, and Switzerland.
  • D. TGV Ouigo
    TGV Ouigo is a low-cost high-speed train service operated by SNCF in France, offering budget fares on selected TGV routes.
  • E. TGV PSE
    TGV PSE is the original generation of French high-speed TGV Sud-Est trainsets that inaugurated high-speed rail service in France.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: mainHighSpeedService
Context triple: [French railway network, mainHighSpeedService, TGV]
  • A. introducedAsHighSpeedService
    Indicates that a service was launched or presented specifically as a high-speed offering.
  • B. primaryHighSpeedOperator chosen
    Indicates that an entity serves as the main operator responsible for providing high-speed service or functionality to another entity.
  • C. hasHighSpeedLine
    Indicates that there exists a high-speed rail line connection between the related entities.
  • D. hasHighSpeedSections
    Indicates that the entity includes segments or portions where operation or movement occurs at high speed.
  • E. hasServiceSpeed
    Indicates that an entity provides a service operating at a specified speed or performance rate.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e3d53f88190a2b690e3f25bb062 completed April 16, 2026, 5:37 p.m.
NER Named-entity recognition batch_69f12aa4d4ac8190922b919c15623963 completed April 28, 2026, 9:46 p.m.
PD Predicate disambiguation batch_69e71b48576c8190a8e93738fd9cfda5 completed April 21, 2026, 6:38 a.m.
Created at: April 16, 2026, 8:35 p.m.