Triple

T22170406
Position Surface form Disambiguated ID Type / Status
Subject Elephant and Castle roundabout E547905 entity
Predicate partOf P40 FINISHED
Object Elephant and Castle road network NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Elephant and Castle road network | Statement: [Elephant and Castle roundabout, partOf, Elephant and Castle road network]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Elephant and Castle road network
Context triple: [Elephant and Castle roundabout, partOf, Elephant and Castle road network]
  • A. Holborn Circus road system
    The Holborn Circus road system is a major junction in central London where several key roads converge, serving as an important traffic and transport hub in the Holborn area.
  • B. Hyde Park road network
    Hyde Park road network is the interconnected system of roads and paths within London’s Hyde Park that provides access and circulation for vehicles, cyclists, and pedestrians.
  • C. Canary Wharf road network
    The Canary Wharf road network is the system of streets, tunnels, and junctions that provides vehicular access and circulation throughout the Canary Wharf business district in London.
  • D. Eltham Road
    Eltham Road is a major stretch of the A20 in southeast London, serving as a key arterial route connecting central London with suburban areas and Kent.
  • E. Regent's Park road network
    The Regent's Park road network is the system of roads and drives that encircle and traverse Regent's Park in London, providing access to its gardens, attractions, and surrounding areas.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Elephant and Castle road network
Target entity description: The Elephant and Castle road network is a major, complex junction and surrounding system of roads in south London that serves as a key transport hub connecting multiple routes into and out of the city.
  • A. Holborn Circus road system
    The Holborn Circus road system is a major junction in central London where several key roads converge, serving as an important traffic and transport hub in the Holborn area.
  • B. Hyde Park road network
    Hyde Park road network is the interconnected system of roads and paths within London’s Hyde Park that provides access and circulation for vehicles, cyclists, and pedestrians.
  • C. Canary Wharf road network
    The Canary Wharf road network is the system of streets, tunnels, and junctions that provides vehicular access and circulation throughout the Canary Wharf business district in London.
  • D. Eltham Road
    Eltham Road is a major stretch of the A20 in southeast London, serving as a key arterial route connecting central London with suburban areas and Kent.
  • E. Regent's Park road network
    The Regent's Park road network is the system of roads and drives that encircle and traverse Regent's Park in London, providing access to its gardens, attractions, and surrounding areas.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e3c4c5c81908d336165816b12e0 completed April 16, 2026, 5:37 p.m.
NER Named-entity recognition batch_69f12a67f4dc81909cc5f8d2c1fe6129 completed April 28, 2026, 9:45 p.m.
Created at: April 16, 2026, 8:34 p.m.