Triple

T22155190
Position Surface form Disambiguated ID Type / Status
Subject railway line Zwolle–Almelo E547516 entity
Predicate instanceOf P0 FINISHED
Object railway infrastructure in the Netherlands C3584 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: railway infrastructure in the Netherlands
Context triple: [railway line Zwolle–Almelo, instanceOf, railway infrastructure in the Netherlands]
  • A. railway network
    A railway network is an interconnected system of tracks, stations, signaling, and rolling stock that enables the organized movement of trains between multiple locations.
  • B. tunnel in the Netherlands
    A tunnel in the Netherlands is a subterranean or submerged passageway designed to facilitate safe and efficient transport—by road, rail, bicycle, or utilities—beneath water, urban areas, or other obstacles within Dutch territory.
  • C. railway infrastructure element
    A railway infrastructure element is any physical component of a rail system—such as tracks, signals, switches, bridges, or platforms—that supports the safe and efficient operation of trains.
  • D. rail transportation infrastructure chosen
    Rail transportation infrastructure encompasses the physical and organizational systems—such as tracks, stations, signaling, power supply, and related facilities—required to support the safe and efficient movement of trains and rail-based services.
  • E. public railway
    A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e3b52088190ad5df386d01eb2fb completed April 16, 2026, 5:36 p.m.
Created at: April 16, 2026, 8:33 p.m.