Triple

T22153780
Position Surface form Disambiguated ID Type / Status
Subject Asse E547479 entity
Predicate railwayConnection P848 FINISHED
Object Brussels–Dendermonde railway line NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Brussels–Dendermonde railway line | Statement: [Asse, railwayConnection, Brussels–Dendermonde railway line]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Brussels–Dendermonde railway line
Context triple: [Asse, railwayConnection, Brussels–Dendermonde railway line]
  • A. Antwerp–Boortmeerbeek–Leuven railway line
    The Antwerp–Boortmeerbeek–Leuven railway line is a Belgian railway route connecting the city of Antwerp with Leuven via intermediate towns such as Boortmeerbeek.
  • B. Ghent–Brussels railway line
    The Ghent–Brussels railway line is a major Belgian rail route connecting the cities of Ghent and Brussels and serving several intermediate towns including Wetteren.
  • C. Brussels–Tournai railway line
    The Brussels–Tournai railway line is a major Belgian rail route connecting the capital region with the city of Tournai and serving as part of an important corridor toward western Belgium and France.
  • D. Ghent–Bruges railway line
    The Ghent–Bruges railway line is a major Belgian rail route connecting the historic cities of Ghent and Bruges and serving several intermediate towns in Flanders.
  • E. Antwerp–Lier–Hasselt railway line
    The Antwerp–Lier–Hasselt railway line is a major Belgian rail route connecting the city of Antwerp with Lier and Hasselt in the Flemish region.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Brussels–Dendermonde railway line
Target entity description: The Brussels–Dendermonde railway line is a Belgian railway route connecting the capital Brussels with the town of Dendermonde, serving several intermediate communities in the Flemish region.
  • A. Antwerp–Boortmeerbeek–Leuven railway line
    The Antwerp–Boortmeerbeek–Leuven railway line is a Belgian railway route connecting the city of Antwerp with Leuven via intermediate towns such as Boortmeerbeek.
  • B. Ghent–Brussels railway line
    The Ghent–Brussels railway line is a major Belgian rail route connecting the cities of Ghent and Brussels and serving several intermediate towns including Wetteren.
  • C. Brussels–Tournai railway line
    The Brussels–Tournai railway line is a major Belgian rail route connecting the capital region with the city of Tournai and serving as part of an important corridor toward western Belgium and France.
  • D. Ghent–Bruges railway line
    The Ghent–Bruges railway line is a major Belgian rail route connecting the historic cities of Ghent and Bruges and serving several intermediate towns in Flanders.
  • E. Antwerp–Lier–Hasselt railway line
    The Antwerp–Lier–Hasselt railway line is a major Belgian rail route connecting the city of Antwerp with Lier and Hasselt in the Flemish region.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e3b52088190ad5df386d01eb2fb completed April 16, 2026, 5:36 p.m.
NER Named-entity recognition batch_69f129f6d5b88190badee2e515a3b633 completed April 28, 2026, 9:43 p.m.
Created at: April 16, 2026, 8:33 p.m.