Triple

T22123338
Position Surface form Disambiguated ID Type / Status
Subject North Woolwich ferry terminal (north bank) E546727 entity
Predicate instanceOf P0 FINISHED
Object riverside terminal C6402 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: riverside terminal
Context triple: [North Woolwich ferry terminal (north bank), instanceOf, riverside terminal]
  • A. ferry terminal chosen
    A ferry terminal is a designated facility where passengers and vehicles embark and disembark from ferries, typically providing ticketing, waiting areas, and docking infrastructure.
  • B. Brightline station
    A Brightline station is a dedicated passenger rail facility that serves as a boarding, alighting, and service hub for Brightline’s intercity trains, integrating ticketing, waiting areas, and connections to other local transportation modes.
  • C. Pink Line station
    A Pink Line station is a designated stop or terminal along a transit system’s Pink Line where passengers can board, alight, and transfer between services.
  • D. riverside location
    A riverside location is a place situated directly along the banks of a river, characterized by its proximity to flowing water and the environmental, recreational, or economic activities it supports.
  • E. West Coast Express station
    A West Coast Express station is a designated passenger rail facility along the West Coast Express commuter line that provides boarding, alighting, and related services for regional train travelers.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e39bf348190b541bfa16a7b71e0 completed April 16, 2026, 5:36 p.m.
Created at: April 16, 2026, 8:31 p.m.