Triple

T22112874
Position Surface form Disambiguated ID Type / Status
Subject Sun Shuttle E546460 entity
Predicate instanceOf P0 FINISHED
Object demand-responsive transport service C35830 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: demand-responsive transport service
Context triple: [Sun Shuttle, instanceOf, demand-responsive transport service]
  • A. demand-responsive bus service chosen
    A demand-responsive bus service is a flexible public transport system where routes and schedules are dynamically adjusted based on real-time passenger requests rather than fixed timetables and stops.
  • B. transportation service
    A transportation service is a system or business that moves people or goods from one location to another using various modes of transport under defined schedules, routes, and conditions.
  • C. multimodal transport platform
    A multimodal transport platform is an integrated system that coordinates and optimizes the planning, booking, and management of journeys across multiple transportation modes (such as rail, road, air, and sea) through a unified digital interface.
  • D. public transport service feature
    A public transport service feature is a specific characteristic, function, or amenity of a public transportation offering that affects how passengers access, experience, and evaluate the service.
  • E. paratransit operator
    A paratransit operator is a transportation service provider that offers flexible, demand-responsive rides—often door-to-door—for individuals whose disabilities or mobility limitations prevent them from using standard public transit.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e38b3848190ac3a4fa97d56e65a completed April 16, 2026, 5:36 p.m.
Created at: April 16, 2026, 8:31 p.m.