Triple

T22099913
Position Surface form Disambiguated ID Type / Status
Subject Clem Clempson E546141 entity
Predicate memberOf P10 FINISHED
Object Bakerloo NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Bakerloo | Statement: [Clem Clempson, memberOf, Bakerloo]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Bakerloo
Context triple: [Clem Clempson, memberOf, Bakerloo]
  • A. Bakerloo line
    The Bakerloo line is a deep-level London Underground railway line running between Harrow & Wealdstone in northwest London and Elephant & Castle in south London, known for serving key central locations such as Baker Street, Oxford Circus, and Waterloo.
  • B. Piccadilly line
    The Piccadilly line is a major deep-level London Underground route running from the north and west suburbs through central London, serving key destinations including Heathrow Airport.
  • C. Jubilee line
    The Jubilee line is a major London Underground line running across the city from northwest to east, serving key financial and commercial hubs including Canary Wharf.
  • D. Hammersmith & City line
    The Hammersmith & City line is a London Underground service running across west and central London, linking Hammersmith to Barking via key hubs such as Paddington, King's Cross St Pancras, and Liverpool Street.
  • E. District line (London Underground)
    The District line is a major London Underground line running across the city from east to west, serving numerous suburban areas and key central London destinations.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Bakerloo
Target entity description: Bakerloo was a late-1960s British blues-rock power trio known for its heavy, guitar-driven sound and association with the emerging progressive rock scene.
  • A. Bakerloo line
    The Bakerloo line is a deep-level London Underground railway line running between Harrow & Wealdstone in northwest London and Elephant & Castle in south London, known for serving key central locations such as Baker Street, Oxford Circus, and Waterloo.
  • B. Piccadilly line
    The Piccadilly line is a major deep-level London Underground route running from the north and west suburbs through central London, serving key destinations including Heathrow Airport.
  • C. Jubilee line
    The Jubilee line is a major London Underground line running across the city from northwest to east, serving key financial and commercial hubs including Canary Wharf.
  • D. Hammersmith & City line
    The Hammersmith & City line is a London Underground service running across west and central London, linking Hammersmith to Barking via key hubs such as Paddington, King's Cross St Pancras, and Liverpool Street.
  • E. District line (London Underground)
    The District line is a major London Underground line running across the city from east to west, serving numerous suburban areas and key central London destinations.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e378dc08190896d6a51597afd5a completed April 16, 2026, 5:36 p.m.
NER Named-entity recognition batch_69f1291440048190992c48893ced0b34 completed April 28, 2026, 9:39 p.m.
Created at: April 16, 2026, 8:30 p.m.