Triple

T22087962
Position Surface form Disambiguated ID Type / Status
Subject Northern Spire Bridge E545833 entity
Predicate designer P184 FINISHED
Object Ramboll NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Ramboll | Statement: [Northern Spire Bridge, designer, Ramboll]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Ramboll
Context triple: [Northern Spire Bridge, designer, Ramboll]
  • A. Ramboll chosen
    Ramboll is a global engineering, design, and consultancy company known for delivering innovative and sustainable solutions in buildings, transport, environment, energy, and infrastructure projects.
  • B. Mott MacDonald
    Mott MacDonald is a global engineering, management, and development consultancy known for its work on major infrastructure projects worldwide.
  • C. Arup Associates
    Arup Associates is a multidisciplinary architectural and engineering firm known for designing innovative, high-performance buildings and cultural venues.
  • D. Ove Arup & Partners
    Ove Arup & Partners is a globally renowned engineering and design consultancy known for its pioneering structural work on landmark projects such as the Sydney Opera House.
  • E. Aurecon
    Aurecon is a global engineering, design, and advisory company known for delivering complex infrastructure and building projects across sectors such as transport, energy, and urban development.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e36d03c8190a83a1ba802b7231b completed April 16, 2026, 5:36 p.m.
NER Named-entity recognition batch_69f128e3a98481908a7b3dc3f2a90276 completed April 28, 2026, 9:38 p.m.
Created at: April 16, 2026, 8:29 p.m.