Triple

T22087622
Position Surface form Disambiguated ID Type / Status
Subject Kali River E545823 entity
Predicate hasHydroelectricProject P15311 FINISHED
Object Kali Hydroelectric Project NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Kali Hydroelectric Project | Statement: [Kali River, hasHydroelectricProject, Kali Hydroelectric Project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Kali Hydroelectric Project
Context triple: [Kali River, hasHydroelectricProject, Kali Hydroelectric Project]
  • A. Bassi Hydroelectric Project
    Bassi Hydroelectric Project is a hydroelectric power station in Himachal Pradesh, India, that generates electricity using the waters of the Uhl River.
  • B. Shanan Hydroelectric Project
    The Shanan Hydroelectric Project is a historic hydroelectric power plant in Himachal Pradesh, India, that harnesses the waters of the Uhl River to generate electricity.
  • C. Larji Hydroelectric Project
    The Larji Hydroelectric Project is a hydroelectric power generation scheme in Himachal Pradesh, India, that utilizes the Beas River to produce electricity through dam-based water storage and release.
  • D. Kopili Hydroelectric Project
    Kopili Hydroelectric Project is a major hydroelectric power station in Assam, India, built on the Kopili River to generate electricity for the northeastern region of the country.
  • E. Uri II Hydroelectric Project
    Uri II Hydroelectric Project is a run-of-the-river power station on the Jhelum River in Jammu and Kashmir, India, built to generate electricity by harnessing the river’s flow near the town of Uri.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Kali Hydroelectric Project
Target entity description: The Kali Hydroelectric Project is a series of dams and power stations in Karnataka, India, that harness the Kali River to generate hydroelectric power.
  • A. Bassi Hydroelectric Project
    Bassi Hydroelectric Project is a hydroelectric power station in Himachal Pradesh, India, that generates electricity using the waters of the Uhl River.
  • B. Shanan Hydroelectric Project
    The Shanan Hydroelectric Project is a historic hydroelectric power plant in Himachal Pradesh, India, that harnesses the waters of the Uhl River to generate electricity.
  • C. Larji Hydroelectric Project
    The Larji Hydroelectric Project is a hydroelectric power generation scheme in Himachal Pradesh, India, that utilizes the Beas River to produce electricity through dam-based water storage and release.
  • D. Kopili Hydroelectric Project
    Kopili Hydroelectric Project is a major hydroelectric power station in Assam, India, built on the Kopili River to generate electricity for the northeastern region of the country.
  • E. Uri II Hydroelectric Project
    Uri II Hydroelectric Project is a run-of-the-river power station on the Jhelum River in Jammu and Kashmir, India, built to generate electricity by harnessing the river’s flow near the town of Uri.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e36d03c8190a83a1ba802b7231b completed April 16, 2026, 5:36 p.m.
NER Named-entity recognition batch_69f128e3a98481908a7b3dc3f2a90276 completed April 28, 2026, 9:38 p.m.
Created at: April 16, 2026, 8:29 p.m.