Triple
T22084828
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Purfleet Ro-Ro terminal |
E545743
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | roll-on/roll-off ferry terminal |
C6402
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: roll-on/roll-off ferry terminal Context triple: [Purfleet Ro-Ro terminal, instanceOf, roll-on/roll-off ferry terminal]
-
A.
ferry terminal
chosen
A ferry terminal is a designated facility where passengers and vehicles embark and disembark from ferries, typically providing ticketing, waiting areas, and docking infrastructure.
-
B.
maritime cargo terminal
A maritime cargo terminal is a specialized facility at a seaport where ships are loaded and unloaded, and cargo is temporarily stored, sorted, and transferred between sea and land transportation modes.
-
C.
bulk cargo terminal
A bulk cargo terminal is a specialized port facility designed for the efficient handling, storage, and transfer of unpackaged bulk commodities such as coal, grain, ore, and fertilizers between ships, land transport, and storage areas.
-
D.
coal terminal
A coal terminal is a specialized facility at a port or rail hub designed for the receipt, storage, handling, and loading or unloading of coal for bulk transportation.
-
E.
port crane
A port crane is a large, fixed or mobile lifting machine used at harbors and container terminals to load, unload, and move cargo between ships and the shore.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e11e3523488190badd54b5d580c00d |
completed | April 16, 2026, 5:36 p.m. |
Created at: April 16, 2026, 8:29 p.m.