Triple

T22083840
Position Surface form Disambiguated ID Type / Status
Subject Tunbridge Wells Hospital at Pembury E545719 entity
Predicate constructionCompletion P1511 FINISHED
Object 2011 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2011 | Statement: [Tunbridge Wells Hospital at Pembury, constructionCompletion, 2011]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: constructionCompletion
Context triple: [Tunbridge Wells Hospital at Pembury, constructionCompletion, 2011]
  • A. constructionCompleted chosen
    Indicates that a construction process or project has been fully finished and reached its completed state.
  • B. constructionCompletedUnder
    Indicates that the completion of a construction project occurred under the responsibility, authority, or supervision of a specified agent, organization, or governing body.
  • C. constructionPhase
    Indicates the specific stage or period an entity is in within an overall construction or building process.
  • D. constructionResumed
    Indicates that previously halted construction activity on an entity or project has started again.
  • E. constructionExpanded
    Indicates that a construction project or structure has been enlarged or extended beyond its original size or scope.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e3523488190badd54b5d580c00d completed April 16, 2026, 5:36 p.m.
NER Named-entity recognition batch_69f128b803f081909a0a121aecf526ae completed April 28, 2026, 9:38 p.m.
PD Predicate disambiguation batch_69e71b20ec50819096ac196c798f8e3c completed April 21, 2026, 6:37 a.m.
Created at: April 16, 2026, 8:28 p.m.