Triple

T22077450
Position Surface form Disambiguated ID Type / Status
Subject Contingency Fund of India E545557 entity
Predicate instanceOf P0 FINISHED
Object government contingency fund C21079 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: government contingency fund
Context triple: [Contingency Fund of India, instanceOf, government contingency fund]
  • A. government budget
    A government budget is a financial plan that outlines a government's projected revenues and expenditures over a specific period, typically one fiscal year, to achieve its economic and policy objectives.
  • B. stabilization fund chosen
    A stabilization fund is a reserve of financial resources established by a government or organization to smooth out economic fluctuations, stabilize revenues or prices, and provide a buffer against external shocks.
  • C. federal trust fund
    A federal trust fund is a government account that collects specific revenues and uses them for designated purposes, often outside the general budget, according to law.
  • D. U.S. government savings security
    A U.S. government savings security is a low-risk, interest-bearing financial instrument issued by the U.S. Treasury that allows individuals to lend money to the federal government in exchange for guaranteed returns over time.
  • E. continuity of government framework
    A continuity of government framework is a structured set of policies, plans, and procedures designed to ensure that essential governmental functions and leadership can continue or be rapidly restored during and after emergencies or disruptions.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e3523488190badd54b5d580c00d completed April 16, 2026, 5:36 p.m.
Created at: April 16, 2026, 8:28 p.m.