Triple
T22071922
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Ranu Pani–Kalimati–Arcopodo route |
E545428
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | mountaineering approach route |
C45758
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: mountaineering approach route Context triple: [Ranu Pani–Kalimati–Arcopodo route, instanceOf, mountaineering approach route]
-
A.
ice climbing route
An ice climbing route is a designated path up a frozen surface, such as an icefall or glacier, characterized by its difficulty, length, and required protection and techniques.
-
B.
mountaineering route collection
A mountaineering route collection is an organized set of documented climbing routes, typically grouped by region, mountain, or difficulty, used for planning, reference, and comparison by climbers and expedition planners.
-
C.
ridge climb route
A ridge climb route is a designated path that follows the crest or spine of a mountain ridge, typically involving sustained exposure and mixed climbing terrain.
-
D.
ice and rock climbing route
An ice and rock climbing route is a defined path up a mixed terrain of frozen water and rock features, graded for difficulty and protection, that climbers follow using specialized techniques and equipment.
-
E.
alpine climbing route section
An alpine climbing route section is a distinct segment of a high-mountain ascent characterized by specific terrain, difficulty, and required techniques within the overall route.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e11e344dfc81909b1d88a7221329c7 |
completed | April 16, 2026, 5:36 p.m. |
Created at: April 16, 2026, 8:28 p.m.