Triple
T22068282
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Kaiser-Hill Company |
E545336
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | industrial contractor |
C45754
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: industrial contractor Context triple: [Kaiser-Hill Company, instanceOf, industrial contractor]
-
A.
MEP contractor
An MEP contractor is a specialized construction professional or firm responsible for the design, coordination, installation, and maintenance of mechanical, electrical, and plumbing systems in buildings and infrastructure projects.
-
B.
architectural contractor
An architectural contractor is a professional or firm responsible for managing and executing the construction of buildings according to architectural designs, specifications, and regulatory requirements.
-
C.
construction worker
A construction worker is a skilled laborer who builds, repairs, and maintains structures and infrastructure using tools, machinery, and physical effort while following safety and building regulations.
-
D.
construction pioneer
A construction pioneer is an innovative leader who introduces groundbreaking methods, materials, or technologies that significantly advance how the built environment is designed and constructed.
-
E.
construction technology company
A construction technology company develops and provides digital tools, software, and innovative systems that improve the planning, design, management, and execution of construction projects.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e11e344dfc81909b1d88a7221329c7 |
completed | April 16, 2026, 5:36 p.m. |
Created at: April 16, 2026, 8:27 p.m.