Triple

T22044599
Position Surface form Disambiguated ID Type / Status
Subject Kenzo Tange Laboratory E544727 entity
Predicate instanceOf P0 FINISHED
Object design laboratory C21006 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: design laboratory
Context triple: [Kenzo Tange Laboratory, instanceOf, design laboratory]
  • A. design practice
    Design practice is the systematic, iterative application of design methods, tools, and principles to solve problems, create meaningful experiences, and refine solutions in real-world contexts.
  • B. design institute
    A design institute is an educational and research organization dedicated to teaching, exploring, and advancing principles and practices of design across various disciplines.
  • C. design study
    A design study is a systematic, often iterative investigation that explores, develops, and evaluates design concepts or solutions within a specific context to address identified needs or problems.
  • D. design center
    A design center is a dedicated space or facility where customers and professionals can explore, plan, and coordinate design elements such as materials, finishes, and layouts for projects like homes, interiors, or products.
  • E. research and design studio chosen
    A research and design studio is a collaborative environment where systematic inquiry and creative experimentation are combined to explore, prototype, and refine innovative concepts, products, or experiences.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e32445c8190ab97089b48a130bb completed April 16, 2026, 5:36 p.m.
Created at: April 16, 2026, 8:25 p.m.