Triple
T22024854
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Horyu-ji Covered Corridor (Kairou) |
E543933
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | covered corridor |
C1193
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: covered corridor Context triple: [Horyu-ji Covered Corridor (Kairou), instanceOf, covered corridor]
-
A.
institutional corridor
An institutional corridor is a long, functional passageway within a formal facility (such as a school, hospital, or government building) that connects rooms and departments while regulating movement and access.
-
B.
ceremonial corridor
A ceremonial corridor is a formal, often architecturally embellished passageway designed to frame and elevate processions, rituals, or symbolic movement through a space.
-
C.
museum corridor
A museum corridor is a long, connecting passageway within a museum that guides visitors between galleries while often displaying artworks or informational exhibits along its walls.
-
D.
covered walkway
chosen
A covered walkway is a roofed passage that provides sheltered pedestrian movement between locations, protecting users from weather while guiding circulation.
-
E.
cavern hall
A cavern hall is a vast, naturally formed underground chamber characterized by high ceilings, expansive open space, and geological features such as stalactites, stalagmites, and rock formations.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e11e2e8ea4819084210fe06d3a1b8d |
completed | April 16, 2026, 5:36 p.m. |
Created at: April 16, 2026, 8:23 p.m.