Triple

T22024854
Position Surface form Disambiguated ID Type / Status
Subject Horyu-ji Covered Corridor (Kairou) E543933 entity
Predicate instanceOf P0 FINISHED
Object covered corridor C1193 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: covered corridor
Context triple: [Horyu-ji Covered Corridor (Kairou), instanceOf, covered corridor]
  • A. institutional corridor
    An institutional corridor is a long, functional passageway within a formal facility (such as a school, hospital, or government building) that connects rooms and departments while regulating movement and access.
  • B. ceremonial corridor
    A ceremonial corridor is a formal, often architecturally embellished passageway designed to frame and elevate processions, rituals, or symbolic movement through a space.
  • C. museum corridor
    A museum corridor is a long, connecting passageway within a museum that guides visitors between galleries while often displaying artworks or informational exhibits along its walls.
  • D. covered walkway chosen
    A covered walkway is a roofed passage that provides sheltered pedestrian movement between locations, protecting users from weather while guiding circulation.
  • E. cavern hall
    A cavern hall is a vast, naturally formed underground chamber characterized by high ceilings, expansive open space, and geological features such as stalactites, stalagmites, and rock formations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e2e8ea4819084210fe06d3a1b8d completed April 16, 2026, 5:36 p.m.
Created at: April 16, 2026, 8:23 p.m.